Higley High School Project

HHS New Building Ribbon Cutting

Higley High School Project

Phase 1 of the Higley High School project will include a 12 classroom, 2-story addition to address student growth and allow more capacity. A potential Phase 2 is outlined in the community meetings below.

Click here to view renderings of the HHS project.

Community Meetings:

HHS Project Progress

Dirt Pad
trenching for low voltage to building 900
6 in ductile fire line from tap to riser room
compacting electrical trenches
AB pile located on pad were density passed
mason laying 1st course of stem
electrical feeders to the new building electrical room and out of building pad
exposed pre slab earth
compaction of ABC using a roller
exposed pre slab earth
Leveling footings
Pouring and checking footing heights
finishing of the slab
east elevation of building
masons continuing third lift
NE building corner step down footing and stem
north elevation of building
north elevation of building from NW corner
south elevation of building
south elevation of building
west building elevations from SW Corner
masonry in fill at east alcove
classroom 1113 0123
interior stairwell
roof framing system
roof framing system
location of the signed beam by HUSD staff
stairs set at interior stairwell
stairs set at interior stairwell
structural steel erected at north and west end of building
one side drywall in corridor and MPE and rough ins
room 1113 one side drywall mpe roughs and backing
room 1115 one side drywall mpe roughs and backing
drywall taping progress in first floor
2nd floor framing and roughs
2nd floor progress
roof deck
north canopy and louvers
sewer line progress
Framing and MPE progross on second floor
column footings post drypacking
Drywall taping progress in first floor
southside exterior
progress on the roof
Glazing progress
Girls Bathroom 1st floor starting polish and grind
dry wallers second siding 2nd floor
outside progress
TPO Roof Completed
exterior painting progress
first floor polished concrete
first floor restroom tile progress
hard lids on second floor
lecture hall progress
second floor exposed ceiling progress
exterior building progress
metal panel progress
final grade progress
stonehard epoxy floor in lecture hall
wrought iron fence and gates progress
11 - entry lighting
exterior building progress
11 - first floor lighting and ceiling tile
12 - exterior lighting package viewed in the early morning
12 - second floor corridor lighting
11 - stainless steel handrails and paint on exterior stairs
12 - teachers workroom millwork and quartz top
12 - wall art
Outside of completed building
Inside Classroom 1
Inside Classroom 2
Higley Knight Wall 1
Higley Wall Art 2
Higley Wall Art
Inside of completed building
HigleyHS 8-1-23-0878